About Me
Experience
Independent Verifier – Track and Permanent Way
Independent verification of detailed design for railway, metro and tramway projects. Key projects include tunnel safety upgrading for EAV (Volturno Independent Authority) and inspection of eight Apulian intermodal hubs for South-East Railways.
Independent Verifier – Track and Permanent Way
Verification of detailed, definitive and feasibility design for major rail infrastructure across Italy, including Genova Metro extensions, Catania Metro-Airport, Malpensa RAILINK, Naples's port railway and Milan branch network.
Head of Technical Organizational Unit
Management of technical structures and resources for the Apulia-Lucania regional railway network (Bari-Altamura-Matera-Potenza). Planning, monitoring and resolution of complex infrastructure issues.
Project Manager – Railway Infrastructure
Management of multidisciplinary detailed design for the Taranto Logistics Platform connection. Coordination of all engineering disciplines across the full project lifecycle.
Project Manager – Railway Track Works
Full project management lifecycle for railway track works: planning, resource assessment, team coordination, site inspections, cost/time forecasting and stakeholder reporting.
Railway Track and Alignment Designer
Track alignment and permanent way design for major Italian rail clients including RFI (Italian Raiways Network), North-Milan Railways, EAV (Volturno Independent Authority), South-East Railways, Venetian Infrastructures and port authorities. Projects span high-speed lines, metro extensions, tram networks, station upgrades and logistics platforms.
What I Do
- Permanent way design across all project phases — from initial site survey with cartographic mapping (referenced to local or absolute coordinate systems) through preliminary, definitive, executive and construction design
- Horizontal and vertical alignment design of the track, both on tangent and curved sections, referenced to fixed points in absolute topographic coordinates
- Preparation and assessment of permanent way bill of quantities, cost estimates and material requirements
- Preparation of permanent way maintenance plans
- Preparation of quality plans for trackwork
- Correction of curves alignment on a relative basis using the Hallade method
- Compliance analysis of railway infrastructure Technical Specifications for Interoperability (TSIs) for the conventional rail system
- Speed upgrade analysis of railway lines
- Feasibility study for new railway lines and stations
- Project Management in railway infrastructure projects
- Risk Evaluation and Assessment in accordance with the Common Safety Method (CSM) under Regulation (EU) No 402/2013
- Inspection of Bridges, Viaducts and Footbridges